Post by Jules on Jul 2, 2005 8:35:54 GMT -8
A big issue right now is to determine what to do about the new library. I have heard that the library commission is set on having the big building that was designed previously. The problem with that is the city has not been able to get financing for that building or its maintenance. I hope that the library commision becomes more realistic.
One idea being considered would be to put a second or third story on block 36 (the block that the pawn shop is on) and to put the library there.
Either way, unless new funding is found, the library needs to be scaled down.
I wonder if the new library could be built in phases?
|
|